FAA Modernization & Project 2025 Accountability Review

A source-based comparison of policy proposals, enacted law, administrative actions, modernization spending, independent audits and aviation safety events.

Research reviewed: November 15, 2026. This is a dated editorial snapshot, not a real-time spending or incident feed.

← Transportation Spending Accountability Register

Evidence standard: Similarity between an administration action and Project 2025 does not establish causation. Proposed policies, enacted law, appropriations, obligations, outlays, contracts and demonstrated outcomes are separate records. No separate official “Project 2026” successor document was established in this review.

At a glance

2025 modernization appropriation$12.5B$9.0B systems and $3.5B facilities, as described by GAO
Systems funds obligated by March 2026$1.8BObligations are not cash outlays
GAO-reported project schedules11,389Not integrated into an overall master schedule as of May 2026

Source: GAO-26-107992 (September 14, 2026). The report describes the $12.5B total, obligations and planning deficiencies.

Project 2025 FAA Proposals vs. 2025–2026 Implementation: Promises, Actions, Funding, and Results

This side-by-side comparison evaluates the Project 2025 FAA recommendations against documented federal actions in 2025 and 2026. It does not compare two separately published documents called Project 2025 and Project 2026. “Implementation” includes measures enacted, underway, prohibited, and not verified; it does not imply that each recommendation has been adopted.

Proposed reformVerified 2025–2026 developmentAssessment
Separate the Air Traffic Organization (ATO) from FAACongress prohibited using funds to implement ATO privatization or separation in FY2026 appropriations §119G; FAA announced internal restructuring.Not implemented as proposed
Replace aviation user taxes with service fees paid directly to ATONo enacted adoption verified in the reviewed sources.Not verified
Authorize ATO revenue bonds for major projectsNo enacted bond authority verified in the reviewed sources.Not verified
Accelerate modernization and digital technologiesBrand New Air Traffic Control System (BNATCS) announced May 2025; GAO documented Phase 1 work.Implementation underway
More flexible acquisition and private-sector implementationFAA accelerated acquisition; Peraton selected as prime systems integrator.Documented alignment, not proof of causation
Change FAA organizationJanuary 2026 structure includes Airspace Modernization Office; that office was required by bipartisan FAA Reauthorization Act of 2024, §207.Reform documented, with pre-existing legislative origin
Facility consolidation and digitizationTechnology replacements documented; no completed broad consolidation established here.Partial progress / further verification needed

Compare Project 2025, Chapter 19, pp. 632–634, FY2026 appropriations §§119G–119J, FAA Reauthorization Act of 2024 §207 and FAA Jan. 27, 2026 organization announcement.

Funding, schedule and audit controls

GAO reported that in June 2026 the FAA's high-level Phase 1 systems estimate was about $10.615 billion, compared with about $9.030 billion allocated for those systems, a gap of about $1.585 billion. GAO reported approximately $10.2 billion for Phase 2 systems excluding facilities and no Phase 2 completion date. These estimates are not an additive, comprehensive lifecycle cost.

GAO found that FAA lacked a comprehensive, documented lifecycle cost estimate and an integrated master schedule. Phase 1 was targeted for December 2028; that target was not a verified completion outcome. FAA reported replacing 2,560 of 5,170 aging copper connections by May 2026.

Congress's FY2026 §119J directed monthly modernization spending plans and briefings. The public-facing register will not treat congressional receipt or acceptance of these plans as verified without records.

Sources: GAO audit and FY2026 appropriations text.

November 13, 2026 nationwide ground stop

Preliminary, investigation open: DOT said telecommunications disruptions impaired communication and radar stability. On November 14, the Secretary described maintenance involving an L3Harris contractor's copper-to-fiber migration and possible router or installation issues, explicitly stating the fault had not been determined. This page does not claim a final technical cause or assign legal responsibility.

Questions for follow-up: change-control and pre-deployment testing; authorization and contractor obligations; communications failover; outage duration and flight impact; corrective actions; and any linkage to funded BNATCS work. Incident investigation records must remain distinct from spending records.

Source: DOT November 14, 2026 statement.

Search the accountability records

These dated editorial records are generated from the reviewed evidence listed below. They are not dynamically updated by the quarterly workflow; changes require source verification and editorial review.

Historical comparison and verification method

The 2021 Bipartisan Infrastructure Law provided $25 billion over five years for aviation infrastructure, including $5 billion for FAA facilities and equipment and $20 billion for airport projects. These component figures must not be added to the $25 billion total. The 2025 modernization funding has a different program scope and should not be presented as a like-for-like annual spending comparison.

For each later quarterly revision, preserve the original proposal, law, dated source, project ID, funding category (requested / enacted / obligated / outlay), cost-estimate scope, milestone, incident evidence, verification date and editorial change log. The existing Transportation Spending Register maintains the broader agency comparison and quarterly collection methodology.

Sources: FAA Bipartisan Infrastructure Law program; GAO audit.

Public source library

  1. Project 2025, Chapter 19, Department of Transportation, pp. 632–634
  2. GAO-26-107992, air traffic modernization, September 2026
  3. P.L. 119-75, FY2026 appropriations §§119G–119J
  4. P.L. 118-63, FAA Reauthorization Act 2024, §207
  5. FAA restructuring announcement, January 2026
  6. DOT ground stop update, November 14, 2026