SUPREME CITIZENS · TRANSPORTATION ACCOUNTABILITY
FAA Modernization & Project 2025 Accountability Review
A source-based comparison of policy proposals, enacted law, administrative actions, modernization spending, independent audits and aviation safety events.
Research reviewed: November 15, 2026. This is a dated editorial snapshot, not a real-time spending or incident feed.
← Transportation Spending Accountability Register
At a glance
Source: GAO-26-107992 (September 14, 2026). The report describes the $12.5B total, obligations and planning deficiencies.
Project 2025 FAA Proposals vs. 2025–2026 Implementation: Promises, Actions, Funding, and Results
This side-by-side comparison evaluates the Project 2025 FAA recommendations against documented federal actions in 2025 and 2026. It does not compare two separately published documents called Project 2025 and Project 2026. “Implementation” includes measures enacted, underway, prohibited, and not verified; it does not imply that each recommendation has been adopted.
| Proposed reform | Verified 2025–2026 development | Assessment |
|---|---|---|
| Separate the Air Traffic Organization (ATO) from FAA | Congress prohibited using funds to implement ATO privatization or separation in FY2026 appropriations §119G; FAA announced internal restructuring. | Not implemented as proposed |
| Replace aviation user taxes with service fees paid directly to ATO | No enacted adoption verified in the reviewed sources. | Not verified |
| Authorize ATO revenue bonds for major projects | No enacted bond authority verified in the reviewed sources. | Not verified |
| Accelerate modernization and digital technologies | Brand New Air Traffic Control System (BNATCS) announced May 2025; GAO documented Phase 1 work. | Implementation underway |
| More flexible acquisition and private-sector implementation | FAA accelerated acquisition; Peraton selected as prime systems integrator. | Documented alignment, not proof of causation |
| Change FAA organization | January 2026 structure includes Airspace Modernization Office; that office was required by bipartisan FAA Reauthorization Act of 2024, §207. | Reform documented, with pre-existing legislative origin |
| Facility consolidation and digitization | Technology replacements documented; no completed broad consolidation established here. | Partial progress / further verification needed |
Compare Project 2025, Chapter 19, pp. 632–634, FY2026 appropriations §§119G–119J, FAA Reauthorization Act of 2024 §207 and FAA Jan. 27, 2026 organization announcement.
Funding, schedule and audit controls
GAO reported that in June 2026 the FAA's high-level Phase 1 systems estimate was about $10.615 billion, compared with about $9.030 billion allocated for those systems, a gap of about $1.585 billion. GAO reported approximately $10.2 billion for Phase 2 systems excluding facilities and no Phase 2 completion date. These estimates are not an additive, comprehensive lifecycle cost.
GAO found that FAA lacked a comprehensive, documented lifecycle cost estimate and an integrated master schedule. Phase 1 was targeted for December 2028; that target was not a verified completion outcome. FAA reported replacing 2,560 of 5,170 aging copper connections by May 2026.
Congress's FY2026 §119J directed monthly modernization spending plans and briefings. The public-facing register will not treat congressional receipt or acceptance of these plans as verified without records.
Sources: GAO audit and FY2026 appropriations text.
November 13, 2026 nationwide ground stop
Questions for follow-up: change-control and pre-deployment testing; authorization and contractor obligations; communications failover; outage duration and flight impact; corrective actions; and any linkage to funded BNATCS work. Incident investigation records must remain distinct from spending records.
Source: DOT November 14, 2026 statement.
Search the accountability records
These dated editorial records are generated from the reviewed evidence listed below. They are not dynamically updated by the quarterly workflow; changes require source verification and editorial review.
Historical comparison and verification method
The 2021 Bipartisan Infrastructure Law provided $25 billion over five years for aviation infrastructure, including $5 billion for FAA facilities and equipment and $20 billion for airport projects. These component figures must not be added to the $25 billion total. The 2025 modernization funding has a different program scope and should not be presented as a like-for-like annual spending comparison.
For each later quarterly revision, preserve the original proposal, law, dated source, project ID, funding category (requested / enacted / obligated / outlay), cost-estimate scope, milestone, incident evidence, verification date and editorial change log. The existing Transportation Spending Register maintains the broader agency comparison and quarterly collection methodology.
Sources: FAA Bipartisan Infrastructure Law program; GAO audit.
Public source library
- Project 2025, Chapter 19, Department of Transportation, pp. 632–634
- GAO-26-107992, air traffic modernization, September 2026
- P.L. 119-75, FY2026 appropriations §§119G–119J
- P.L. 118-63, FAA Reauthorization Act 2024, §207
- FAA restructuring announcement, January 2026
- DOT ground stop update, November 14, 2026